Before starting construction, the developer must obtain the appropriate permit. The absence of this document will attract the developer to administrative responsibility and fines. To obtain a permit, it is necessary to develop and agree in the examination of a project that will meet current building codes, quality, safety and environmental protection requirements.
What is the project documentation
The project is a set of documentation, which consists of 10-12 sections, depending on the type of capital object, and includes both graphic plans and an explanatory text part. The full composition is set out in GD No. 87 dated February 16, 2008.
The article discusses the concept of organization of construction production on the example of a linear object of a highway and gives a decoding of PPO, PPR and POS.
Construction Management Project (COS)
Before deciphering the concepts of PPR and PPO, it is necessary to clarify the definition of a construction organization project (PIC).
In order to build a quality facility, you need to adhere to a clear and consistent work plan. To do this, a project is being developed for the optimal use of the land plot for the construction site and methods are described by which the object will be put into operation in a timely manner. At the same time, the final estimate should not go beyond the approved budget.
The explanatory text part of the PIC contains information about the location and size of the land plot of future construction and the characteristics of the object. In the case of a road, this is the length, width, number of lanes. The project details what construction equipment will be used, where the areas for storage and loading and unloading of materials and structures will be located.
A mandatory requirement is a description of the location of temporary roads, access roads, places of detour, bypass and storage of soil. An integral part is the designation of wheel washing points, security posts, warehouses, administrative buildings and a residential camp.
Graphic documents include a plan of the territory on which the object and temporary structures are applied, which are required for logistics. Then technological schemes or maps are given, with the help of which the optimal sequence of work is built.
Another integral document is the PPO, the decoding and analysis of which will be at the end of the article.
Project of work (PPR)
Projectorganization of construction is developed for the entire facility. It allows you to see the overall picture of the implementation of the future structure. POS is the material on the basis of which further detailed study of a separate section or node takes place. For each such site, a project for the production of works (PPR) is developed. It defines effective ways of performing work, taking into account the productivity of workers and construction equipment.
PPO in construction: transcript
For the construction of a highway, it is necessary to allocate and mark the boundaries of the land. Such a section is called a right of way. This lane includes the road structure, as well as auxiliary facilities. The latter are necessary for its functioning and further maintenance. The boundaries of the land plot depend on the category of the road, the width and number of lanes. Deciphering the PPO - project of the right of way.
Protection zones are marked in the project where the road crosses existing communications, as well as those communications that need to be relocated.
In addition to the road structure, the plan shows the boundaries of areas for deforestation, buildings for demolition, as well as storage areas for road structures and materials.
Recommended:
Stages of organization development. Organization life cycle
What do giants like McDonald's, Apple and Walmart have in common, besides having over 100,000 employees, is an interesting question. They all started small, with just a few people, and then grew. The stages of organizational development apply to domestic companies as well. All major manufacturers face transition periods. Basically, without government support and large investments, everything starts with small business
Essence and concept of organization. Form of ownership of the organization. Organization life cycle
Human society consists of many organizations that can be called associations of people pursuing certain goals. They have a number of differences. However, they all have a number of common characteristics. The essence and concept of organization will be discussed in the article
Horizontal communication: basic concepts, types, management methods in an organization
What is communication? External and internal business communication. Characteristics of horizontal communication, possible problems and ways to solve them. Characteristics of vertical communication: hierarchical and inverse subgroups, their description, possible problems and their solution
What is labor rationing? Basic concepts, organization, types, methods of calculation and accounting
Thinking about what labor rationing is, many of us have associations of production, an uninterrupted workflow. This term is of great importance in economic planning. And although today you can often hear the opinion that the rationing of the work of workers is an echo of the Soviet system of production, most industrial enterprises are in no hurry to abandon the use of this tool
Beton-Element LLC: Scandinavian construction concepts
The Element-Beton company is engaged in the construction of residential real estate from prefabricated reinforced concrete structures. The Scandinavian concept of construction is based on technologies for the rapid construction of reliable facilities, elegant design, a sparsely populated quarter and large areas for living and recreation