Organization of construction. POS, PPR, PPO, decoding of concepts

Table of contents:

Organization of construction. POS, PPR, PPO, decoding of concepts
Organization of construction. POS, PPR, PPO, decoding of concepts

Video: Organization of construction. POS, PPR, PPO, decoding of concepts

Video: Organization of construction. POS, PPR, PPO, decoding of concepts
Video: What's Required To Open A Pawn Shop 2024, April
Anonim

Before starting construction, the developer must obtain the appropriate permit. The absence of this document will attract the developer to administrative responsibility and fines. To obtain a permit, it is necessary to develop and agree in the examination of a project that will meet current building codes, quality, safety and environmental protection requirements.

What is the project documentation

The project is a set of documentation, which consists of 10-12 sections, depending on the type of capital object, and includes both graphic plans and an explanatory text part. The full composition is set out in GD No. 87 dated February 16, 2008.

The article discusses the concept of organization of construction production on the example of a linear object of a highway and gives a decoding of PPO, PPR and POS.

Construction Management Project (COS)

Construction project
Construction project

Before deciphering the concepts of PPR and PPO, it is necessary to clarify the definition of a construction organization project (PIC).

In order to build a quality facility, you need to adhere to a clear and consistent work plan. To do this, a project is being developed for the optimal use of the land plot for the construction site and methods are described by which the object will be put into operation in a timely manner. At the same time, the final estimate should not go beyond the approved budget.

The explanatory text part of the PIC contains information about the location and size of the land plot of future construction and the characteristics of the object. In the case of a road, this is the length, width, number of lanes. The project details what construction equipment will be used, where the areas for storage and loading and unloading of materials and structures will be located.

A mandatory requirement is a description of the location of temporary roads, access roads, places of detour, bypass and storage of soil. An integral part is the designation of wheel washing points, security posts, warehouses, administrative buildings and a residential camp.

Graphic documents include a plan of the territory on which the object and temporary structures are applied, which are required for logistics. Then technological schemes or maps are given, with the help of which the optimal sequence of work is built.

Another integral document is the PPO, the decoding and analysis of which will be at the end of the article.

Project of work (PPR)

construction management
construction management

Projectorganization of construction is developed for the entire facility. It allows you to see the overall picture of the implementation of the future structure. POS is the material on the basis of which further detailed study of a separate section or node takes place. For each such site, a project for the production of works (PPR) is developed. It defines effective ways of performing work, taking into account the productivity of workers and construction equipment.

PPO in construction: transcript

road construction
road construction

For the construction of a highway, it is necessary to allocate and mark the boundaries of the land. Such a section is called a right of way. This lane includes the road structure, as well as auxiliary facilities. The latter are necessary for its functioning and further maintenance. The boundaries of the land plot depend on the category of the road, the width and number of lanes. Deciphering the PPO - project of the right of way.

Protection zones are marked in the project where the road crosses existing communications, as well as those communications that need to be relocated.

In addition to the road structure, the plan shows the boundaries of areas for deforestation, buildings for demolition, as well as storage areas for road structures and materials.